Liebherr-Logistics GmbH (LLG) is a division of the Liebherr Group, which includes over 140 plants in a total of 13 divisions such as Earthmoving and Maritime Cranes.
LGG needed additional storage space at short notice for the year 2024. The three-part warehouse built for this purpose will be used to store and pick a wide range of goods, from excavator parts weighing several tonnes to 1g light sealing rings. LGG decided in favour of a storage concept from SCHULTE.
from the planning phase through realisation to after-sales
Pallet, cantilever and shelving racks for all three hall sections
through in-house planning, in-house production and in-house assembly
7 metre high shelving system with over 20 levels at different heights
Stored goods
From excavator parts weighing tonnes to sealing rings weighing
1 g
Shelving solution
Combination of three shelf types
Customer
Liebherr-Logistics GmbH, Oberopfingen site
Industry sector
Logistics
Scope of order
Consultancy, planning, delivery, assembly, aftersales
Requirements
Installation of a newly built logistics centre with pallet, cantilever and shelving racks
Property data
Special features
Shelving system offers the option of being automated if required
Liebherr-Logistcs GmbHis part of the Liebherr Group, which has a total of 140 plants. When additional storage space was needed at short notice, it built a three-part warehouse at the company's Oberopfingen site. SCHULTE developed the entire warehouse concept for the new building.
Why SCHULTE?
"SCHULTE assured us straight away that we would have exactly one point of contact from the planning phase through to realisation and after-sales. I don't know where else you can find that these days - it's an absolutely unique selling point that convinced us," says Bianca Dreher, Project Planner Logistics at Liebherr-Logistics GmbH, explaining the decision in favour of SCHULTE.
"And the contact person was really available to us at all times. Minor or last-minute questions were clarified immediately on the phone, which was great."
Collaboration with SCHULTE a complete success
"Communication was exemplary throughout the entire project and the result is excellent. It's hard to believe the speed with which SCHULTE was able to deliver and install such high quality," says a delighted Kilian Ribhegge, Operations and Logistics Manager at Liebher-Logistics.
"Even a detail like the waste separation on the construction site made a positive impression on me. I've never seen it this tidy before."